Work continued in a similar vein to previous weeks at the site. Although I felt there was less activity this week, I'm sure there was a lot going on. The digger has continued to expose more of the old culvert, despite being backed into the extremities of the site. It seems the junction of the two culverts from Little Harwood and Knusden may be revealed after all.



Here you can just about see the general form of the culvert. The walls are broken down before being repaired with reinforced concrete and the roof replaced. The repaired culvert is on the left awaiting concreting over and the old culvert is on the right. The exposed bit is in the middle with the Blakewater running right to left.